Mindaro worked to tight deadlines and a stringent Owner's Engineer to deliver For Construction drawings for PV array's on 95 KFC rooftops. The key to delivering this rollout was to adapt our product in order to meet the clients needs whilst also allowing for streamlined engineering and project submission.

The rooftops of SME's are never easy, especially those with an abundance of HVAC on a small footprint that also incorporate many verandah's/awnings. Mindaro's ability to analyse and interpret the information from the site inspections as well as the structural certificates allowed for accurate and concise drawings for the installers to follow.

Get in touch with Mindaro the next time you have a rollout of projects to ensure you meet your project deadlines on time.

Southgate Plaza (1125 kWh/500 kVA)